The Renovations have begun and we want everyone to be up-to-date during the entire process.
The first phase of the renovations is insulating the airspace between the inside sactuary roof and the outside peaked roof.
We will occasionally have videos available showing the process and progress throughout the renovations.
(Windows Media Player and a high-speed internet connection required)
March 7 2008 - Cleanup and Prep for Materials on East side
March 8 2008 - Loading materials through hole in roof on the East side
March 19 2008 - Vapor Barrier, styrofoam and cardboard baffles installed to hold blown-in insulation. Lower level frame and walkway installed. |